We were committed to supporting the local community and economy during the project, employing 22 staff, including four apprentices and one graduate from Manchester. Throughout this time, 19% of the project value was spent with local contractors and through various fundraising efforts, managed to donate in excess of £15,000 to The Christie NHS Foundation, a leading cancer treatment facility in the area
To avoid unnecessary disruption, we took strategic measures to ensure minimal closure of public spaces and that noise was kept to a minimum by utilising attenuation equipment on construction apparatus. We also ensured that all materials were stored safely overnight. This will be continued when the energy centre opens, with noise studies being undertaken in the vicinity and mitigation measures being put in place to align with local authority standards.