The project presented our designers with a challenge as they would be designing the initial stages of what will become one of London’s major heat networks. The location of the installation made the project challenging.
Located close to Euston Station and St. Pancras International Station, the area would involve removal and reinstatement of cobbles, working on busy highways and walkways, and dealing with the congested existing utilities in central London.
After extensive heat loss calculations and comparisons, we specified Logstor Series 3 single pipework which has an expected design life in excess of 50 years. The 581m of district heating pipe which makes up the core of Phase 1 will include a range of pipe sizes. After careful analysis of potential future heat loads, all have been sized to allow for planned future expansion and range from 65mm to 250mm pipework.
The pipework has a moisture detection alarm system installed, accurate to 1m, allowing any issues to be addressed as early as possible and before a leak occurs. In total, the Phase 1 district heating network will connect 339 properties, with 184 further properties connected in Phase 2, as well as the school and community centre.