Somers Town Energy Network

Connecting Camden to sustainable heat

Providing low-carbon heat and hot water to homes and community buildings, find out how the Somers Town Heat Network supports Camden's net zero ambitions.

Executive summary

The Somers Town Heat Network delivers low-carbon heat and hot water to homes, community facilities and a school across Camden. We designed and built the district heating network and energy centre, creating a future-proofed solution designed for long-term expansion. The scheme supports Camden Council's carbon reduction ambitions while laying the foundations for one of London's major heat networks.

What we’ve achieved with this project

£5.5m

contract value

80%

efficiency of energy system

15 year

asset management lifecycle

Project overview

Camden Council had ambitious targets to reduce their carbon emissions by 40% by 2020 and one of the key stages to their plan is the Somers Town Heat Network which provides heat and hot water to five housing estates, a new community centre and the redesigned Edith Neville School, and provide electricity to The Francis Crick Institute via a private wire.

We were responsible for the design and build of the district heating network and energy centre in a dual phased solution, along with providing operation and maintenance services for a period of 15 years.

District heating pipework installation

Vital solution

The scheme was implemented in two phases: the first saw the installation of the district heating network connecting four estates and the retrofit of an energy centre within the basement of an under-used car park. The second phase included the installation of the CHP engine and thermal stores, alongside connections to an additional housing block, community centre and school.

A phased approach was chosen due to limited historical operational data, allowing the Council to review network performance following the initial connections before determining the most appropriate CHP engine size for the final solution.

Francis Crick Institute, London

Key Benefits

Overcoming challenges of district heating installation within busy London Borough

The project presented our designers with a challenge as they would be designing the initial stages of what will become one of London’s major heat networks. The location of the installation made the project challenging.

Located close to Euston Station and St. Pancras International Station, the area would involve removal and reinstatement of cobbles, working on busy highways and walkways, and dealing with the congested existing utilities in central London.

After extensive heat loss calculations and comparisons, we specified Logstor Series 3 single pipework which has an expected design life in excess of 50 years. The 581m of district heating pipe which makes up the core of Phase 1 will include a range of pipe sizes. After careful analysis of potential future heat loads, all have been sized to allow for planned future expansion and range from 65mm to 250mm pipework.

The pipework has a moisture detection alarm system installed, accurate to 1m, allowing any issues to be addressed as early as possible and before a leak occurs. In total, the Phase 1 district heating network will connect 339 properties, with 184 further properties connected in Phase 2, as well as the school and community centre.

Innovative retrofit energy centre solution into basement car park

The energy centre is in a former underground car park which has been retrofitted and has seen us employ a creative design to comply with the original building.

This can be seen in the flue solution which was designed to run up the side of the building and has been clad to match the building’s other lift shaft.

Future-proofed solution to cater for phased installation and further development

Contingency was built into the design to accommodate future increased demand and also to ensure ease of expansion for future planned connections.

For the first phase of the energy centre, three 1.3MWth boilers were installed with space left for further plant and equipment. The energy centre supplied heat and hot water for the first phase for two years before the second phase saw the installation of a 900kW CHP engine, four 9,000L thermal stores and three 11,000L thermal stores.

Efficient installation of equipment which will provide significant carbon savings

The delivery of the plant equipment for Phase 2 of the project was carried out over a two day period which saw us complete all traffic and pedestrian access management to ensure safety.

We aimed to minimise disruption as much as possible by completing the deliveries on a weekend to alleviate traffic congestion.

Camden Council had given a great deal of thought to the possible long-term evolution of their heat network, and have procured a comprehensive 15 year Asset Management contract with Vital which will guarantee a minimum efficiency performance level in excess of 80% for the system.

The network has been designed so that after the CHP’s lifecycle expires, Camden will be able to use whatever the most low carbon and cost effective technology of the future may be.